Trades – Remodel Blog http://www.remodelblog.net Field Notes From A Custom Builder Mon, 14 Aug 2017 05:07:49 +0000 en-US hourly 1 https://wordpress.org/?v=4.4.18 How To Hide That Hard-To-Remove Wallpaper http://www.remodelblog.net/2014/11/how-to-hide-that-hard-to-remove-wallpaper/ http://www.remodelblog.net/2014/11/how-to-hide-that-hard-to-remove-wallpaper/#respond Fri, 21 Nov 2014 04:14:41 +0000 http://www.remodelblog.net/?p=3224



When you look online, you will find a TON of articles and videos about how to get rid of wallpaper. This video was published before and shows how to remove it. Some people recommend chemicals, others use vinegar or hot water, and some love using a steamer. What is noteworthy is that for every success story there is a tale of failure and frustration. Why?

The answer is simple: there are different kinds of wallpaper! Some are fairly thin, and come down as entire sheets faster than you can say “I love chocolate.” Others are made of thick, designer-type paper that will not come off no matter how much you soak, spray, or steam. This is what Melinda (featured in video above) and I ran into, and here is how we solved that problem.

We left the second layer of paper on the walls. We carefully inspected all the seams and corners to make sure they were in good shape. If you find any that are not, use some glue to make sure everything stays in place. Remove all nails, screws, and hooks you come across. Mask all surfaces you do not want paint on, and remove cover plates from light switches, electrical outlets, and so forth. Next, using a full-sized roller cover and paint tray, paint all wallpaper with an oil-based, fast-drying sealer. You will want to wear a suitable respirator and open doors and windows for ventilation, as the sealer vapor is toxic. Depending on the wallpaper and how much it absorbs the sealer, you may need to apply a second coat. You will love how this sealer will begin to hide that awful wall covering.

Next, find yourself an experienced drywall finisher. This person will apply drywall tape or mesh to all the seams, and then float these seams with drywall compound, known in the trades as ‘topping.’ In Melinda’s house, we asked the drywall finisher to ‘float’ (or ‘veneer’ or ‘skim coat’) all the walls. This means a thin layer of compound is applied onto the sealed surfaces.

TIP: If you have crown moulding or other trim that has a narrow profile, tell the drywall pro to feather the veneer along the moulding’s edges. If that is not done, the edge of the moulding’s profile will disappear and look strange.

After the skim coat dries, a vacuum sanding system is used to lightly sand it, leaving a beautifully smooth surface, ready to paint. Or, instead of the veneer, you can have the walls textured. This will be cheaper and a bit more forgiving if your walls contain a lot of irregularities.

TIP: Make sure a bright floodlight is used when the veneer is sanded. The light will make imperfections much easier to see. Use of a vacuum system is also important. This type of dust is very fine and will travel *everywhere*. Covering up any furnace vents is a good idea, too.

Now you will be ready to apply a regular, water-based drywall primer. An added benefit of this primer is that, once dry, it  allows a much better view of the quality of the drywall finishing work. Look at where the seams were taped. Hold a straight edge across the seams horizontally, and if there are noticeable bumps, ask the finisher to float out that area more. Simply use a pencil and mark the areas that need attention. The extra veneer and drywall primer will cover the pencil marks eventually.

In case you are wondering about the purpose of oil-based sealer, the reason is that the skim coat contains a lot of moisture. To prevent that moisture from weakening the wallpaper adhesive, you will want to apply a barrier between the paper and the veneer.

Do you know of better ways to deal with annoying wallpaper that won’t come off? Please let us know in the comment section!

]]>
http://www.remodelblog.net/2014/11/how-to-hide-that-hard-to-remove-wallpaper/feed/ 0
Ready For Winter? 10 Home Maintenance Tips! http://www.remodelblog.net/2014/10/ready-for-winter-home-maintenance-tips/ http://www.remodelblog.net/2014/10/ready-for-winter-home-maintenance-tips/#comments Mon, 27 Oct 2014 16:39:30 +0000 http://www.remodelblog.net/?p=3172

The SF Bay Area received some much-needed rain Friday night, and the end of this week will bring more. We are slowly but surely moving toward winter, and it is time to take a look around the house and make sure we are ready.


Let’s start outside:

  • Are the gutters clean and downspouts clear? A single story home is easy to check yourself, but taller and/or hillside houses may need a professional with tall ladders.
  • Where does rain water flow to? Down to the ground, right next to your foundation? Not a good idea. Even so-called splashblocks, which are wedge-shaped pieces of plastic or concrete, about 18 to 24 inches long, meant to guide water away from your house, are not adequate. Ideally you have underground drain pipes leading water away to the street, to a catch basin, or any other destination where water will not impact your home.
  • Another option is plastic drainage sleeves. They are attached to the bottom of downspouts (I use plastic ‘zip’ ties as fasteners) and then rolled out and away from the foundation. Do not buy products that are just a few feet long; instead find something at least 8 feet or longer. Remember that you are likely to lose a few feet just by connecting it to the downspout. Some hardware stores sell it in bulk and can cut it to whatever length you want.

  • Take a look at all windows and doors. Do they close properly and make good seals against rain and wind? Hopefully you took care of any caulking and painting during the summer, but if not, now is a good time to make quick repairs. Once the temps start to dip, caulk and paint will not cure properly. I sometimes cheat and use a heat gun to help the curing process along.
  • What about exterior lighting? Are all bulbs and light sensors operational? Next Sunday daylight savings goes into effect, and it will be dark earlier. Do any timers need adjusting? Speaking of timers, maybe now is good time to check on your garden sprinkler system. Perhaps it should be set to ‘Winter’ mode, or be switched off.
  • If you live in an area where frost is a typical companion, make sure to empty and put away garden hoses. Protect any exterior water pipes with insulation.



Inside your home:

  • When is the last time you checked the furnace filter? Modern homes are built so airtight that they easily trap allergens, dust, and other irritants. Especially if you have pets, check the filter quarterly. They are generally easy to replace or clean, depending on the type of filter used. A clean filter also puts less strain on the furnace blower motor.
  • If you have a gravity furnace or other kind of gas-fueled heater, make sure the pilot light is lit, and that there are no flammable objects nearby.
  • Is your propane tank filled? Are you stocked up on wood pellets? Firewood and kindling?
  • Take a look at smoke and C02 detectors. You need one smoke detector in each sleeping area, and in each hallway outside these sleeping areas. You also need one carbon monoxide detector on each floor. Combination smoke/carbon monoxide detectors are available. Photoelectric detectors are much better than ionization types, as they detect smoke and alert you much faster. In fact, many cities no longer allow the ionization technology. Here is a good explanation.
  • Fire Departments around the country recommend testing smoke alarms each time you change your clocks.

Do you have some good tips about getting ready for winter? Please let me know and I will share them next time.

]]>
http://www.remodelblog.net/2014/10/ready-for-winter-home-maintenance-tips/feed/ 1
Desalination: Good For Israel. Good For California? http://www.remodelblog.net/2014/05/desalination-good-for-israel-good-for-california/ http://www.remodelblog.net/2014/05/desalination-good-for-israel-good-for-california/#respond Sat, 31 May 2014 01:41:30 +0000 http://www.remodelblog.net/?p=2972

The New York TImes reports today on how Israel is mitigating a shortage of much-needed rain by desalinating seawater. California, reeling from its driest winter in history, has a long coast line and the same opportunity as Israel.



Of course, the problem with desalination is that it requires a lot of energy. According to the article, ten percent of Israel’s total electrical consumption is used for desalination efforts. As California gets plenty of sun, this power could be generated by solar energy collection. However, and as described in an earlier article on this blog, solar energy generation requires a lot of cooling, which is generally addressed with water.

While corrosive, seawater can be used for cooling, but the warm water that is returned to the sea does add to global warming. Clearly, the entire process is a balancing act. It is said that necessity is the mother of invention. As the need for water grows, so will development of new technology to meet this demand. California can only raise prices and restrict water usage to a certain point. Homeowners grow tired of looking at grey lawns, and farmers and industry do not want to keep raising prices. Maybe it is time desalination technology receives another look.

There are more ways for California to save water:

prohibit sale and installation of garbage disposers. They waste lots of water, are hard on plumbing systems, and are largely unnecessary.

develop and encourage the use of grey water systems. Speed up the process of including this technology in building codes

Prohibit seafaring vessels, including those operated by the military, from dumping waste overboard. Garbage and sewage needs to be offloaded ashore or onto other vessels for proper treatment and disposal.

]]>
http://www.remodelblog.net/2014/05/desalination-good-for-israel-good-for-california/feed/ 0
Flush Water-Saving Toilets After Each Use! http://www.remodelblog.net/2014/04/flush-water-saving-toilet-after-each-use/ http://www.remodelblog.net/2014/04/flush-water-saving-toilet-after-each-use/#respond Fri, 04 Apr 2014 18:56:00 +0000 http://www.remodelblog.net/?p=2958

Now that an official drought has been declared in California, many people remind themselves that “When it’s yellow it’s mellow; when it’s brown flush it down.” That was fine and well during the days of toilets that used nine gallons of water to keep waste moving. With today’s modern toilets that use between one and two gallons, however, flushing each time is crucial.

About five years ago, we remodeled a client’s bathroom and installed a Toto wall-mounted dual-flush toilet. She figured that she could save even more water by not flushing when it was not  absolutely necessary. As a result, the lack of water prevented toilet paper from moving along, and began to accumulate in the sewer line. Eventually the line clogged, and a plumber was needed to fix the problem. Contrary to typical floor-mounted models, a “snake” can not be used with the wall-mounted type. The toilet had to be removed and reinstalled. Save yourself the unnecessary expense and headache. If you have a low-flow toilet, be sure to flush after each use.



Oh, the photo? It is a poo-powered motorcycle, called the “Toilet Bike Neo.” Toto says it wants to raise awareness of water waste. There are no plans to make this bike available commercially.

]]>
http://www.remodelblog.net/2014/04/flush-water-saving-toilet-after-each-use/feed/ 0
Curved Ipe Deck – Photos & Tips http://www.remodelblog.net/2014/03/curved-ipe-deck-photos-tips/ http://www.remodelblog.net/2014/03/curved-ipe-deck-photos-tips/#respond Tue, 04 Mar 2014 02:03:15 +0000 http://www.remodelblog.net/?p=2902



Summer is getting closer, and decks are wonderful places to spend time outdoors. We have built many of them, mostly using redwood or cedar, and sometimes using composite material or hardwood.

Just a few years ago, we crafted a curved ipe deck that became a true labor of love and one of our flagship projects. The structure underneath was made out of pressure-treated lumber (referred to in the trades as ‘PT’), and the decking material was 5/4″x6″ ipe. This deck is roughly 45 feet long and slightly over 12 feet wide at its widest point.

We will share the sequence of events of this project from start to finish, with as many juicy details as I can dust off, not to mention plenty of photos. Remodel Blog encourages comments and questions, as always.

curved ipe deck with dog

© CVAN Builders

Deck Design

Our clients had a team of professionals to tackle their project:

  • A landscape designer who shaped the deck, flagstone patio, plants and irrigation;
  • An architect who prepared drawings as part of the building permit application;
  • Structural and soils engineers who provided footing and framing details;
  • My company’s crew of carpenters, electricians and plumbers; and
  • A landscape contractor
Curved ipe deck and stainless cable railing

© CVAN Builders

During the deck design phase, the owners were quite busy deciding on many details, including what kind of decking material to use. There are a huge number of composite materials available, but most of them have ugly side effects that do not become visible until later. Fading colors, incompatibility with certain plastics and rubbers (outdoor furniture, plant pots, and garden hoses), mold, and deformation are just a few examples. If you are interested in a composite deck, make sure you do your homework and check it twice.

Ipe Decking

In the end, the clients decided on 5/4” (meaning a full one inch thick) Iron Woods ipe. Iron Woods ipe is a particular ‘brand’ of ipe that received high ratings from Consumer Reports magazine. Also known as Brazilian walnut, this is an extremely dense material, fire-resistant, very heavy, and at times challenging to work with. Ipe requires special preparation and installation methods, and definitely takes more time to install than softwoods such as cedar or redwood.

Deck framing, Lay-out & Elevations

deck site preparation

© CVAN Builders

After receiving the building permit, it was time to get to work. The owners had already cleared away old brush and a tree. The first thing we did was to establish elevations with laser levels, lay out the framing structure and related footings. There was an existing foundation from an old deck that had been torn down a long time ago. We wanted our new lay-out to bypass this, so we could simply leave it in the ground rather than wasting time with jackhammers to remove it. The photo below shows several footing excavations, as well as a utility trench in the foreground. We buried a new water line in this one, and electrical and more water lines in another.

Utility trench & pier excavation

© CVAN Builders

Concrete Footings

When considering footings, we don’t recommend the use of so-called ‘pier blocks’ as structural supports. They are not as substantial as steel-reinforced concrete, and lack strength and connectors that improve your deck’s integrity in case of an earthquake. This may not be a problem in your area, but in and around San Francisco we have to take this condition quite seriously.

Concrete footing detail

Used with permission © Andersson Woodrow



The engineering specs called for 24″x24″x24″ footings. The pedestal of the footings had to be a minimum of 8″ above grade, making them at least 24 inches tall.

When you build forms, make sure you will be able to remove them later. Building inspectors rarely allow wood forms to be left in the ground, nor would you want to.

Consider coating the inside of the forms with form oil. This will make them easier to remove once the concrete has set. Use care not to get oil on rebar, as that will prevent concrete from sticking to the steel.

There also was a specific rebar design; see drawing detail. Generally all rebar and hardware connectors have to be in place prior to inspection. So-called ‘wet-set’ installation — when brackets etc are set at the same time concrete is poured — is generally not allowed. Depending on your specific design, rebar is often required to be connected to whatever hardware that’s called for, and a ‘wet-set’ procedure makes that very difficult if not impossible.

Please keep in mind that this footing spec was created specifically for the location and conditions of our job site. On some projects this design will be overkill, while on others it may be insufficient.

concrete deck footing form

© CVAN Builders

Steel stakes were added later to keep form from moving. There was a fair amount of concrete to be poured, and we decided against trying to mix it onsite. Instead we arranged for a cement truck and a concrete pumping contractor to fill the excavated footings. We like using a vibrator to get rid of any air pockets in the cement. Be careful to not vibrate the cement too long or all the gravel will sink to the bottom.

When calculating how much concrete you will need, add roughly 10% extra to the total you come up with. This is because:

  • During excavation the holes often become larger than you intended;
  • Sometimes small cave-ins occur, requiring additional concrete;
  • A lot of concrete will stay in the pump truck’s hose;
  • Concrete is cheap. Why take the risk of coming up short?

There are some handy concrete calculators to be found online, but double-check the math to make sure it’s right. The day after the pour we stripped the forms and started installing 4×12 beams, plus the ledger board that’s bolted against the wall.

Deck Framing

As an aside, we prefer to build decks to be free-standing; i.e., without being physically connected to the house. That’s not always practical, and it means more footings. When a ledger is installed against a house, as it was in this case, make sure you use spacers (see Resources below) between the back of that board and whatever kind of surface it will be bolted against. These spacers greatly reduce the chances of rot and decay. Using galvanized sheet metal (GSM) ‘Z’ flashing that tucks under the siding’s moisture barrier and sits on top of the ledger board is an excellent idea. Use only galvanized thru-bolts (as opposed to lag screws) with beefy washers to attach the ledger board. If your engineer allows lag screws, first drill pilot holes and fill them with silicone-based caulk. This will help prevent moisture from entering the framing. The engineer called for specific blocking, hardware, and methods to fastening the ledger to the existing framing.

Deck support beams

© CVAN Builders

In the meantime, Economy Lumber’s truck showed up with the ipe delivery. We found a place where it would not be in blasting sun each day, and we made sure to use stickers in between each layer. These thin pieces of wood create a space between each layer of boards, allowing air circulation and giving ipe a chance to acclimate. This is an important step, so don’t skip it and allow at least five days for this process.

Ipe storage

To prevent weeds from growing under the deck, the grade was covered with landscape fabric, followed by about three inches of gravel. A small tree was planned in the deck area, so pipes for irrigation and conduit for lighting were installed before we proceeded with installing deck joists. The owners also had an underground drainage system installed.

drain rock under deck

Placing Deck Joists

The joists were installed at 16″ OC (on center). Because the ipe boards were a full one inch thick we technically could have installed framing at 24″ OC, but to keep the decking as strong and stable as possible, we opted for a tighter span. Remember that when you frame with PT lumber you must use galvanized nails and hardware. The chemicals used to treat this lumber are quite corrosive, so regular steel would not last long. Remember, too, to treat all cut ends of this lumber with a preservative such as Copper Green. As an aside, not all framing hardware is available as galvanized. In those case we typically create a barrier between the hardware and lumber with a piece of bitumen tape. Details, details…

20120405_postpl

In the photo above, Josh helps to figure out placement of the railing posts. A cable system will be installed between them, and due to huge stress placed on the posts we want to make sure the posts are anchored to the framing as well as possible.

One other thing about PT you should be aware of is that it is sold in different colors using different preservatives. Read more about the fine details here.

Curved deck framing

To make the framing lumber last as long as possible, we added bitumen tape to the top of the joists, prior to installing the deck boards. Typically the gaps between them collect dirt as time goes by. Then the dirt gets wet during the winter, or when plants are watered or the deck is hosed off, leaving an almost constant humid collection of dirt. Over time this will begin to rot the framing, even the PT kind. Self-sealing bitumen tape, such as Grace Vycor, is relatively inexpensive and easy to apply.

Once all the blocking and joists are in, it is time to call the building inspector and get the framing segment approved and signed off.

Curved deck and step framing

Installing Deck Boards

The ends of ipe boards have a tendency to check, so it is recommended to immediately seal every end after it has been cut. We used a gel called AnchorSeal. Initially there were conversations with the client about possibly using a hidden fastener system, but nearly every reputable ipe supplier recommended using face screws at 16” o.c. to prevent cupping. There was not much difficulty with warped or twisted boards, and the usual ‘board bender’ tools worked fine.

Curved ipe deck and step

Using Stainless Steel Screws For Your Ipe Deck



To keep the boards from cupping, it was widely suggested to use two screws at 16” OC. The clients were not fond of the idea that all those screw heads would remain visible, so they asked that they be covered up with ipe plugs. While we always pre-drill screw holes — even in softwoods — this is doubly important with ipe. We installed over 1,800 stainless steel screws; stainless because this does not interact with the corrosive chemicals found in pressure treated lumber. Of course we also had to counter-sink the screw heads so there would be room for the ipe plugs.

Ipe Plugs

At first we thought about making our own plugs, but ipe is so hard this would probably take days, not to mention we’d burn through countless bits. I found a web site with reasonable prices, and before long a shipment arrived. The next question was how to keep the plugs in place. Nick suggested Titebond 3, applied with a Q-tip to the inside wall of the counter-sunk hole. If applied to the outside of the plug, most glue would get removed while inserting the plug into the board and leave glue on top of the deck board.

Ipe plugs

After inserting all 1,803 ipe plugs (I’m mentioning that number only for dramatic effect; it actually went faster than anticipated), we came back the next day with sharp chisels and trimmed all that stuck out above the deck board surface. Later we checked the entire deck and sanded where necessary.

Deck Ventilation

As you’ve probably read or heard, you want good ventilation under your deck. The right side of our deck sits nearly 4 feet above the ground, and with the installation of trellis material, adequate air movement is not an issue. However, on the left side of the deck there’s little room under the step. To encourage air flow, we left a ¾” gap between the bottom of each step and the top of the riser. It looks just like a shadow line and is not as visually obvious as one might think. You can also paint the step or stair framing black to minimize its visibility. A gap was also left between the flagstone and riser mostly to prevent the riser from wicking water, and as an added bonus this gap helps with air circulation as well.

Curved Riser

Clearly ipe is too hard and dense to bend. While I’ve read few articles from carpenters who cut boards to create 1/4″ x 7″ strips that could be bent and glued to 2 additional strips to create a 3/4″ riser, this seemed not easy to do. For one thing, running ipe through a table saw in that manner must’ve left many saw blades smoking! We decided to buy several nearly clear 2x redwood boards, and milled those to the dimensions mentioned above. The first two layers were stapled and glued to the riser framing, and the last layer was glued, clamped, and received a few finish nails at joints. The color of the redwood complements that of the ipe, even when they age.

Deck step

Railing Posts

The railing posts were pressured-treated 4x4s bolted as well as possible to joists and blocks. We then covered all four sides with ipe and installed deck boards around them. This looks far better than butting deck boards up against the 4×4 and setting the vertical post wrap boards on top of the deck boards. We used a combination of galvanized finish nails and stainless steel trim head screws to assemble the posts.

cable_term

Curved Stainless Steel Railing

The railing and ‘interim’ steel posts were custom-made. The manufacturer supplied us with a steel template for the holes that had to be drilled in the wood posts. The cables were a challenge. We used a rigid wire to come up with a total length for each cable, and took that to the cable company. They fastened terminators at each end, and supplied us with nuts etc. Because building code requires that spacing can not be less than 4 inches between each cable, they had to be installed very tightly to minimize any slack.

The threaded terminators were located between the first post and the house, leaving very little room for tools and adjustments. Tightening the nuts was not always easy as some of the cables would start turning right along. While it was tempting to put a Vice Grip type of pliers on the cable, it would be easy to damage it. In the end the pliers were installed at the very end of the threaded terminators, taking care to preserve the threads so finish nuts could be installed. Installing these cables was a great opportunity to practice ‘being Zen’ at work!

Stainless steel cable terminations

Curved rail-to-post connection

Resources

See also our post on Second Story Deck Construction

Note: This article was first published on April 11, 2012. Due to a malware attack on our servers in 2013, a few posts were lost including this one. As there was no back-up available at that time, we have now reconstructed and republished this article. You may be able to view the original version by visiting the WayBackMachine and entering Remodelblog.net in the search box.

This post, including all text, photographs, and drawing, are protected by U.S. copyright laws. Please ask for permission before using all or parts of this post.

]]>
http://www.remodelblog.net/2014/03/curved-ipe-deck-photos-tips/feed/ 0
Building Spirit at Tassajara Zen Mountain Center http://www.remodelblog.net/2013/12/building-spirit-at-tassajara-zen-mountain-center/ http://www.remodelblog.net/2013/12/building-spirit-at-tassajara-zen-mountain-center/#respond Fri, 27 Dec 2013 21:14:09 +0000 http://www.remodelblog.net/?p=2695

Last September, I visited Tassajara Zenshinji and hot springs, located in California’s Carmel Valley. After a scenic but bumpy ride — it takes roughly 90 minutes to cover 14 miles — my friend and I arrived at the Center. We spent some time familiarizing ourselves with our surroundings, and it was easy to become seduced by the simple yet elegant designs and choice of building materials.

20131118_tass_110
Tassajara’s main entrance, under construction at the time of my visit, built primarily out of fir.

20131118_tass_112

I love the joinery, and I was particularly interested in the connection between the post ends and the rocks they sit upon. The ends are sculpted to follow the contour of the rocks, but they did not appear to be fastened to the rocks in any way (by means of steel rods and epoxy, for example.) I also could not find any connections between the rocks and possible underground footings, making me wonder about earthquake safety.

20131118_tass_116

 

If you have knowledge of rough carpentry or structural engineering, you will notice that some of the cut-outs are too deep. Assuming the new roof will be similar to other roofs at Tassajara, I do not foresee any issues. Heavy clay tiles, on the other hand, do require substantial support, especially in areas prone to earthquakes.

20131118_tass_114

Shown below is the entrance to showers, changing rooms, and hot springs. Straw privacy screens
are visible on the left. The facilities have separate entrances for men and women. The springs are co-ed at specified times.

20131118_tass_60

Notice the bottoms and ends of rafter tails. Someone thought it a good idea to seal them, but used white paint instead of a clear sealer. Use of the latter would have preserved the wood’s natural beauty and aesthetic.

20131118_tass_58

 The elevated roof over the door, often seen in Chinese and Japanese designs, allows not only light, space, and airflow, but also lends an ethereal feel to the passage.

20131118_tass_59

Vertical, overlapping siding boards have a rustic look, and so does the straw-covered fence. Actually, the straw has thin horizontal strips of redwood underneath, providing greater privacy and increased strength. At my home there was a prefab straw ‘mat’ (about 6 feet tall) placed to disguise a well pump. Because there was no framing behind it to offer support, it eventually fell apart. I do like the look of it.

20131118_tass_56

A different kind of privacy screen, made with bamboo uprights and thin batten boards.

20131118_tass_91

 

The potential for fire is high. A dry climate plus the extensive use of kerosene lamps calls for caution. Surely the swimming pool doubles as a useful resource for fighting fires.

20131118_tass_50

Plenty of light and the beauty of wood, without any noticeable hardware, make this newly constructed
bathroom quite appealing.

20131118_tass_94
The coat hooks were made of a tree branch.

20131118_tass_95

It is close to the yoga building, shown below.

20131118_tass_64

The perfect place for a cup of coffee early in the morning.

20131118_tass_84

Here is an outdoor kitchen counter with a sink, coffee machines, and plenty of tea. This is where guests would gather before the dining hall opened for daily meals. Here, too, the simplicity, functionality and general sweetness of design makes it very appealing. I am wondering what this setting looks like (and how it functions) during winter months.

Some shelves on the left side allow for display of china.

20131118_tass_86
The entrance gate to the swimming pool was built as if it was furniture. Exquisitely crafted, the choice
of high quality lumber and hardware made it a joy to use.

20131118_tass_17

20131118_tass_20

The dining hall. Notice how the headers above the ground floor windows are curved at the top, while those
above doors are straight. I always love the mixture of rocks (lower wall) and vertical wooden boards.

20131118_tass_87

The table with red table cloth would collect the guests’ napkins (plus rings labeled with last names) after each meal.  Before the next meal Tassajara’s kitchen staff would rearrange them to appear in alphabetical order.

20131118_tass_30

Another example of joinery.

Copper gutters, downspouts, and a leader head.

20131118_tass_29

Logs sculpted into seating

20131118_tass_47

I hope that these photos and descriptions are inspirational, and that they motivate you to visit Tassajara. The Center is open to guests several months during the summer, and there are work/study programs available. Below is Tassajara’s contact information as well as several external links to more information about its history and design.

Tassajara Zen Mountain Center
39171 Tassajara Road
Carmel Valley, CA 93924
(415) 865-1899
http://www.sfzc.org/tassajara/

Other links:

 

]]>
http://www.remodelblog.net/2013/12/building-spirit-at-tassajara-zen-mountain-center/feed/ 0
Finishing A Birch Door With GF Arm-R-Seal Urethane Topcoat http://www.remodelblog.net/2013/11/finishing-a-birch-door-with-arm-r-seal/ http://www.remodelblog.net/2013/11/finishing-a-birch-door-with-arm-r-seal/#respond Sun, 24 Nov 2013 22:53:31 +0000 http://www.remodelblog.net/?p=2764




One of my desk tops is actually a solid core door. It spans across two filing cabinets, making for a nice, long work surface. The top has an attractive birch veneer skin which I never bothered to seal. I figured I would get around to it some day, and that day finally arrived. In addition, because the door is just 1-3/8″ thick, I was afraid it might sag in the middle. Given that I had to clear everything off my desk anyway, I decided to add some reinforcement underneath.

Choosing A Finish

My friend Nick Probst, a cabinetmaker in Oakland, CA, recommended an oil-urethane product called Arm-R-Seal. Made by General Finishes, it has an excellent reputation for yielding a beautiful, long-lasting topcoat.

Surface Preparation

I started by sanding all surfaces with 120 grit sandpaper, followed by another sanding with 220 paper. Since it was a fairly large surface, I used an orbital sander. After carefully wiping off all the dust, I rubbed on the first coat of Arm-R-Seal. You can see in the photo below how it definitely darkens the wood, but it also brings out the grain quite nicely.

birchtop_2

Rather than having to breathe fumes in my house, I put the door on two sawhorses in my yard. The first coat was completed in the late afternoon, and by early evening I covered it with a clean tarp. The birch veneer was porous enough that it readily absorbed the first coat. The next morning I rubbed that coat with 0000 steelwool, followed by a second rub-down with Arm-R-Seal, satin finish. Here is what the birch veneer looks like after four coats, each with a successive ‘rubs’ of steel wool.

birchtop_3

 

Easy As Pie

I stopped after seven coats. I was thinking of maybe going for ten, but I really needed my desk back and was about to take a trip. It takes hardly any time at all; just a little elbow grease. After almost every coat I waited for perhaps two hours, and then covered it with a tarp. There were squirrels messing around in a tree above, and I really did not want anything dropping on the drying finish. An oscillating fan helped speed up the drying process. You will notice that after so many coats of Arm-R-Seal plus the steelwool treatments the surface is super smooth — almost slippery.

birchtop_4

 

Adding An Aluminum Strongback

Even after several years of use, the door was still as straight as could be. Still, I opted to add a 48″ piece of aluminum angle iron to prevent any kind of distortion. I used a jigsaw to ease the sharp corners. It is important to install plenty of strong screws, and not the ones used for drywall, as they can break. Make them plenty long so they get a good bite. Most of these doors have particle board centers, which have far less integrity than solid wood. If you look carefully at the photo below, you will notice that the angle iron does not sit centered between the left and right edges. I installed it slightly further toward the left, which is the rear edge of the desk. This was done to prevent scraping my knees.

birchtop_5

By the way, I moved the door indoors and applied the last coat just before leaving on a 5-day trip. I cracked a few windows, and when I returned the urethane odor was entirely gone. Have fun with your refinishing project, and feel free to ask any questions, as always!

 

]]>
http://www.remodelblog.net/2013/11/finishing-a-birch-door-with-arm-r-seal/feed/ 0
Sperry Instruments GFI6302 GFCI Outlet Tester Review http://www.remodelblog.net/2013/11/sperry-instruments-gfi6302-gfci-outlet-tester-review/ http://www.remodelblog.net/2013/11/sperry-instruments-gfi6302-gfci-outlet-tester-review/#respond Sun, 17 Nov 2013 08:09:59 +0000 http://www.remodelblog.net/?p=2769

Last year, I reviewed two electrical outlet testers: F-Circle’s CircTest 3579-4 for regular, grounded receptacles; and the Commercial Electric MS6860H, which can also be used to test GFCI circuits. The main complaints I voiced were that both were labeled on one side only, making it cumbersome to test receptacles that were installed upside down, and that the CircTest had lens covers that fell off if I grabbed the unit the wrong way.



The Sperry Instruments GFI6302 addresses both these issues. It seems well-built, and features:

  • Labels on both sides of the unit
  • Lenses that are integrated in such a way that they can not accidentally be pulled off
  • Bright neon indicator lights, indicating polarity, hot, neutral, ground, etc.
  • Ribbed rubber sides so your fingers get a good grip when removing the outlet tester from a receptacle
  • A GFCI button that appears to function correctly, and is located on the top
  • A lifetime warranty
  • Instructions in English, French, and Spanish.

20131119_sperry_2

I can find only one downside, which is the way this tester is packaged. Packaging consists of a plastic blister pack and cardboard. Sperry should follow in the footsteps of so many other manufacturers — Apple and Sandisk, for example — and minimize  the use of plastic.

Aside from the blister pack, the GFI6302 is Remodel Blog’s top choice of GFCI outlet testers. I bought a review model at Amazon for $8.95, but immediately afterwards the price went up to $10.89. Still, I think it is worth the money. Happy testing, and please do it safely!

]]>
http://www.remodelblog.net/2013/11/sperry-instruments-gfi6302-gfci-outlet-tester-review/feed/ 0
New Concrete Slab In Ten Easy Steps http://www.remodelblog.net/2013/11/new-concrete-slab-in-ten-easy-steps/ http://www.remodelblog.net/2013/11/new-concrete-slab-in-ten-easy-steps/#respond Sun, 03 Nov 2013 21:24:38 +0000 http://www.remodelblog.net/?p=2648

It is about time we publish a hands-on, how-to, nuts & bolts article. Last week we poured a new concrete slab that is part of a larger remodeling project. The pad was made for a Jacuzzi hot tub that needed to be relocated.

Ready? Here we go…

 

1. Figure out the dimensions of the slab you need. I like to make a simple drawing to make sure I am not missing anything — see below. (In the bottom right-hand corner the client’s identity was redacted)

concrete_pad_sketch

(Client info redacted to protect her privacy)

2. Determine precisely where you want it, and keep in mind that most municipalities require a clearance from the property line. This distance can be four feet or more. Check with your local building or planning department. While on that topic, most building departments do not care about so-called flatwork — a different term for concrete pads, driveways, and such, as long as you do not put something underneath, such as plumbing, electrical conduit, and so forth.

3. Figure that the slab should be at least five inches thick. Why? You need at least two inches from the top of the rebar to the top of the slab, and that same distance from the bottom of rebar to the bottom of the slab. The area where two pieces of rebar intersect produces a dimension of one inch, assuming you are using 1/2″ rebar. Plus two to the top and two to the bottom = 2 + 1 + 2 = 5. If you plan to install something very heavy on the slab, or something with a high point load, do yourself a favor and check with an engineer. It is better to spend a few hundred bucks on an expert than far more on a demo crew to take out your concrete.

You may already know about my disdain and distrust of articles written by e-how. They publish info that is often incorrect, in part because many of their so-called ‘contributors’ have zero experience with the topics they write about. Stay far away from these folks — all they want is for you to click on ads.

4. Excavate your site to make room for the forms and slab, and be sure to allow for at least three inches of gravel underneath. Figure out what you will do with the dirt. Can it go elsewhere on the property, or does it have to be hauled away? Is there anything below the surface that you are excavating? In our case there was a lawn sprinkler, so we asked the client’s landscape to disconnect it. Otherwise, if a sprinkler pipe ever needed repair you would not be able to get to it.

Should your excavation be more than 5 or 6 inches, be sure to alert Underground Service Alert before you start work. Read more about them in this earlier post.

5. Once your form is in place (remember to install braces so the form will not fall apart once concrete is poured), compact the gravel with a Whacker compactor or similar. This equipment is heavy, so having a helper on hand is a good idea.

concrete_form_dobie

6. Install the necessary rebar, and be sure to use ample 2″ dobies (shown above) to create the necessary clearance between the gravel and the underside of the rebar. Be sure to tie everything together, and please do not use pieces of rock or other loose material that could dislodge during the pour.

7. Figure out how much concrete you will need. There are calculators on the internet that can help you figure this out. When you enter the dimensions, keep in mind that the grade of your location may not be level. At our job site, the yard sloped toward the house, so one side of the pad required more concrete than the opposite side. For example, using the dimension shown in the sketch, the calculator linked to above says I need 0.9 cubic yards. Yet I ordered 1-1/4 cu. yd. and still did not have enough. We happened to have two left-over bags sitting around, and those saved our bacon.

I recommend ordering about ten percent extra. Also consider if you would like to have a color added. Something like ‘lampblack’ yields a slight darker color, which is often nicer than the standard color of cement and it does not cost much. Will you want an accelerant to speed up the drying process?

concrete_pad_pour

8. Depending on the size and location of your project, you can either carry the concrete by wheelbarrow from the deliver truck to the site, or you can hire a pump truck which uses hoses to pump the cement from the truck to your project. An so-called gondola can also be used. Given that this was a small project, concrete went straight from the truck in a wheelbarrow. Concrete companies usually include a brief standby time in their charges to allow for this. Apply form oil to the inside of the form material to help concrete not stick to it. Be sure to not get this oil on the rebar.

9.  Once the pour is complete, used a screed to level the concrete from side-to-side. Then use a wide float attached to a pole to smooth out the surface. Let it sit for awile so it can start to set. Then with hand-held float start the finish, round over the edges, and so forth. The final finish can be a ‘broom’ finish or a trowel finish. Depending on what you intend to use the slab for, many other finishes are available.

10. Remove the forms, finish the sides of the concrete pad if necessary, and you are good to go!

concrete_pad_tub_move



In our particular case, we installed 3/4 inch rigid electrical conduit underneath, had it inspected by the local building inspector, and then did the pour. You can see the conduit stubbed out of the pad; it has black electrician’s tape at the top of it. The disconnect for the tub was installed in the right rear of the tub in the photo below (not shown). Be sure to check the National Electrical Code, as there are specific distance and line-of-sight requirements.

hot_tub_installed


]]>
http://www.remodelblog.net/2013/11/new-concrete-slab-in-ten-easy-steps/feed/ 0
Solar Power Day And Night! http://www.remodelblog.net/2013/10/solar-power-day-and-night/ http://www.remodelblog.net/2013/10/solar-power-day-and-night/#respond Sun, 13 Oct 2013 16:44:18 +0000 http://www.remodelblog.net/?p=2612

NPR’s Alan Yu wrote an interesting article about Abengoa Solar. On Wednesday, Abengoa cranked up the world’s largest solar energy plant of its kind. What is newsworthy is not only its size — it powers 70,000 homes in Arizona — but the technology that enables it to store energy during the day and then generate power at night.

In a nutshell, so-called parabolic trough collectors capture the sun’s energy and use it to heat oil. The oil boils water, which in turn powers turbines that generate electricity.

And here is the interesting part: the oil can also transfer its heat to enormous tanks filled with salt. The salt retains that energy, and can heat the oil back up after the sun sets (or when demand for electricity increases beyond typical capacity), using it to complete the cycle described above.



When I first heard about Solyndra, a solar panel manufacturer in California’s Silicon Valley and mentioned in NPR’s article, I was puzzled by how it could possibly compete with manufacturers in China. Solyndra had a unique design for its solar collectors, but not as special as the technology developed by Abengoa. Clearly, any company hoping to succeed in the vast solar market must focus on bringing innovative technology to market. Energy storage, from typical computer batteries to tanks of salt, is on the minds of many R&D labs around the world.

Another substantial challenge for developers of solar energy installations is their use of water. Cooling of production plants can take hundreds of millions of gallons of water per year, and especially in sunny areas that are highly suitable to solar energy collection, water supply is often sparse.

Mr. Yu mentions that Abengoa has additional installations underway in California’s Mojave Desert and in South Africa.

According to Wikipedia, Abengoa Solar registered more than 112 CSP (concentrating solar power) and PV (photovoltaic technology) patent applications as of May, 2012. It has offices in San Francisco, CA, and is a subsidiary of Abengoa, SA,  a multi-national corporation based in Seville, Spain.

]]>
http://www.remodelblog.net/2013/10/solar-power-day-and-night/feed/ 0